Back to blog
Guide

The Night The System Was Down

Connectivity fails, a service is unavailable, and the venue still has to open. What to have ready, and the part everyone forgets — putting it all back afterwards.

The connection is down, or a service is unavailable, and it is 20:00.

The room does not care. You are open in an hour either way.

What actually stops

Worth knowing in advance, because it is rarely everything:

Taking bookings. But the ones already made are usually knowable if anyone printed or noted them.

Payments. ⚠️ The one that hurts most, and the one with a physical fallback.

Guest history. Who this person is, what they like. Available only in the memory of whoever is on.

Recording. Everything that happens is happening unrecorded, and that is tomorrow's problem.

The half-hour of preparation

Done once, in daylight, and it holds for years.

Print or export tonight's bookings, daily. ⚠️ Yes, on paper. It costs nothing and it is the difference between a manageable night and a guessed one.

Know the payment fallback. ⚠️ Test it once — a backup terminal or method nobody has tried is not a fallback.

A form for recording what happened. Time, table, what was taken, what was promised. Anything, as long as it exists — a blank sheet with the right headings.

One number to call. Who to contact, and who decides whether to open.

During

Tell people it is happening. Staff first, then guests where relevant. ⚠️ "We are writing things down tonight" pre-empts most of the friction.

Write more, not less. Every promise, every adjustment, every unusual thing. It feels excessive and it is not.

Take names. ⚠️ The thing most often lost — without them, nothing from the night can be reconciled or followed up.

Do not improvise on money. A stated fallback, applied consistently, beats several different approaches by several different people.

The part everyone forgets

Putting it back.

⚠️ The outage gets handled and the recovery does not. The system returns, everyone is relieved, and a stack of handwritten notes sits somewhere.

Enter it the next day, not next week. A day later it is transcription; a week later it is interpretation.

Assign it to one person, with the time to do it. ⚠️ It is real work and it needs real hours — expecting it to happen alongside a normal shift is how it does not happen.

Then check what is missing. Some things will be. Better found on Tuesday than at month end.

Afterwards

Write down what did not work. While it is fresh. ⚠️ The fallback that turned out not to exist, the number nobody had, the thing nobody thought of.

Fix one of them this week. One is enough — and it is more than most venues do after an outage.

Two outages, two plans

Ours is down        their system, your problem, no ETA you control
Ours is fine, the line is down  everything local still works

⚠️ The second is more common and needs a completely different response, but venues prepare for neither and improvise both.

Find out which, in thirty seconds

Does anything else on the same connection work?

⇒ ⚠️ Ask this before calling anyone. Half of all "the system is down" calls end here.


The paper you need is not a full backup

Trying to run the whole system on paper  fails, always
Capturing only what cannot be recreated  works

⚠️ Three things cannot be recreated afterwards: what was ordered, what was paid, and who is owed. Everything else can be reconstructed later.

Keep it findable

⇒ ⚠️ A paper plan in a locked office is not a plan. It has to be where the person on the floor is standing when it happens.


Taking payment is the real constraint

Card terminal on the same connection  it is down too; know this in advance
Independent terminal or mobile data   it is not; test it once

⚠️ Test which one you have on a quiet day. Discovering it at 10pm is the difference between an inconvenience and a lost night.


Tell guests before they ask

Said at the door        it becomes a small inconvenience
Discovered at payment     it becomes a bad experience

⚠️ The information costs nothing and changes the whole interpretation.


The part everyone forgets is the re-entry

The outage    an hour
Re-entering it  the next morning, and it is nobody's shift

⚠️ Assign it before the night ends, with a name and a time.   ⇒ Unassigned, it gets done partially by three people, which is worse     than not at all.


Write the one page, once

Who to call. What still works. Where the paper is. Who re-enters, when.

⚠️ One page, four answers. The cost of not having it is paid entirely in the worst hour of the year.



Three to hold

Whether tonight's bookings exist outside the system. ⚠️ Check today. It is a yes-or-no question and the answer determines how bad the next outage is.

Whether the payment fallback has been tested this year. Untested is the same as absent.

Days from an outage to the records being entered. Rising means it is not being treated as work.

Where the record has to sit

An outage is survivable when the day's essential information exists somewhere that does not depend on the thing that failed, and recoverable when there is one obvious place to put the notes back. Both are decisions made in advance, on a quiet afternoon.

tasteck keeps bookings and takings on records that can be exported before service, so a night can be run from what was printed and reconciled afterwards.

Nothing about the night was unmanageable. What made it hard was that everything had to be invented at 20:00, by people who were also opening.


Read next

Free, no signup, ~5 minutes

Map out your operations in 5 minutes

Eight questions cover reservations, customer management, shifts, and settlement. Results shown instantly with industry benchmark. Sales emails only if you request them.

Your answers are not stored. The assessment runs entirely in your browser.

Try tasteck free for 30 days

No credit card required. Full access to reservations, cast shifts, dispatch, and analytics.

  • No card required
  • Free data migration support
  • All features unlocked for 30 days